FAQ

Build Time


A time study from Lorraine (France)


click to open
House erected in Oct. 2002 - one day for setting up the styro stones and concrete pour.

A demonstration for a small house (9*9 m) with trained people


click to open
Precut styro stones according to plan.


click to open
Range of styro stones to be used.


click to open
All the styro stones needed.


click to open
Platform.


click to open
First layer in place.


click to open
Second layer in place.


click to open
Trestles in place.


click to open
Vertical alignement.


click to open
Fourth layer.


click to open
Fifth layer, windows openings visible.


click to open
Lintels in place.


click to open
After 1 hour, first floor is complete.


click to open
Front Gables built.


click to open
Gables from a different point of view.


click to open
Back Gables set, well within the second hour.


continue to FAQ - Concrete 