A time study from Lorraine (France)
|
House erected in Oct. 2002 - one day for setting up the styro stones and concrete pour. |
A demonstration for a small house (9*9 m) with trained people
|
Precut styro stones according to plan. |
|
Range of styro stones to be used. |
|
All the styro stones needed. |
|
Fifth layer, windows openings visible. |
|
After 1 hour, first floor is complete. |
|
Gables from a different point of view. |
|
Back Gables set, well within the second hour. |
|